Project Areas

A Project Area in Agile PM represents a distinct structural unit, typically focused on a specific part of the overall work.
It provides a way to break down initiatives into smaller, more manageable components that can be handled independently by different teams or based on specialized expertise.

Project Areas

Scope levels

Each Project Area can be defined at different levels, depending on the desired scope:

  • specific to a single Project,
  • shared across a Project Group, or
  • global, valid for all Projects and Groups in the system.

For example:
A project of type Client Implementation may include Areas such as Data Migration, System Configuration, and User Training. Alternatively, a project group such as Marketing Projects may include shared areas like Campaigns and Content Creation, available to all projects in that group.

Note

The scope of a Project Area depends on the combination of the Project and Project Group fields:
• If Project is selected, the Area applies only to that Project.
• If Project is empty but Project Group is selected, the Area applies to all Projects in that group.
• If both fields are empty, the Area is considered global, valid across the entire Agile PM module.

Configuration path: Project Area definition → Advanced panel → Project and Project Group fields
Display panel name: Advanced
System panel name: Project Area

Project Area Scope

Responsibility and collaboration settings

Each Project Area may have a designated Owner — the person responsible for overseeing and coordinating the work within that Area.
A Social Group can also be assigned to the Project Area — just like in Projects — to represent the team or department involved in discussions and decisions related to that area.
This helps ensure accountability, collaboration, and clear ownership over specific sections of the project.

Configuration path:

  • Project Area definition → Basic panel → Owner field
    Display panel name: Basic
    System panel name: Project Area
    Display field name: Owner
    System field name: Primary User

  • Project Area definition → Advanced panel → Social Group field
    Display panel name: Advanced
    System panel name: Project Area

Project Area Responsibility

WIP (work-in-progress) Limits

Like Projects, Project Areas may also use WIP Limits to control the number of Cases that are allowed to remain in specific workflow states within that Area.
These limits are applied per Project Area, and they function independently from the WIP limits defined at the Project level.
This mechanism ensures that each Area of the project stays manageable and avoids bottlenecks.

A separate WIP limit can be defined for each of the following System States:
CONSIDER, READY, IN PROGRESS

If a limit is exceeded, the system will block transitions to the respective state until the number of Cases in that state within the same Project Area in the Case’s Project falls below the defined limit.

Configuration path: Project Area Definition → WIP Limits panel → Consider, Ready, and In Progress fields
Display panel name: WIP Limits

System panel name: Project
Display field name: Consider, Ready, and In Progress fields
System field name: Consider WIP Limit, Ready WIP Limit, and In Progress WIP Limit fields

Project Area WIP