Contains the scheduled maintenances for the managed assets. Each maintenance can be planned based on date, parameter value or both. Past maintenance plans are kept only for reference and can be deleted at any time. Entity: Eam_Managed_Asset_Scheduled_Maintenances (Introduced in version 19.1)
The date, when the maintenance is planned. NULL means, that the plan is not related to date, but to tracked parameter value. If both date and parameter are specified, the maintenance is performed when any of the conditions is met.
The value of the tracked parameter (as specified in the maintenance type) at which the maintenance will be performed. For example, for a car, we can schedule maintenance at 20,000 km mileage. NULL means, that the maintenance is not planned based on parameter, but rather only for date. If both date and parameter are specified, the maintenance is performed when any of the conditions is met.
Columns
Date
The date, when the maintenance is planned. NULL means, that the plan is not related to date, but to tracked parameter value. If both date and parameter are specified, the maintenance is performed when any of the conditions is met.
Property
Value
Auto Complete
no
Data Filter
no
Default Value
None
Enter Stop
yes
Ignore for Insert Order
no
Is Entity Name
no
Max Length
-1
Order
2147483647
Ownership Reference
no
Pasword
no
Picture
no
Primary Key
no
Readonly
no
RTF
no
Sortable
no
Summary Type
None
Supports EQUALS_IN
yes
Type
date (Allows NULL)
UI Memo Editor
no
UI Width
Medium
User Login
no
Visible
yes
Date - Supported Filters
Filter Type
Default
Include Nulls
Hidden by Default
Equals
NULL
yes
no
GreaterThanOrLessThan
None
yes
no
Is_Dismissed
Specifies whether the notification for the maintenance is dismissed and the planner has decided the course of action.
The value of the tracked parameter (as specified in the maintenance type) at which the maintenance will be performed. For example, for a car, we can schedule maintenance at 20,000 km mileage. NULL means, that the maintenance is not planned based on parameter, but rather only for date. If both date and parameter are specified, the maintenance is performed when any of the conditions is met.